| Preview
| Description
| Preview
| Description
|
|
April 5
A group of members checks the front deck during replacement of the rotting main beams.
|
|
April 5
More work on the deck beams.
|
|
April 5
Paul Kallio takes a well-deserved break.
|
|
April 13
The slalom course gets partially assembled and painted prior to installation.
|
|
April 13
Ric Corewyn does his best impression of a drowned rat.
|
|
April 13
Phaedra Harder, guest Chris Maslak, and Louise Harder rest after a day of cabin cleanup and repair.
|
|
April 13
The work party group takes time at the end of the day to dry out and have a beer.
|
|
April 18
Rob Elliott strings a tieback line to dry antifoul paint before attaching it to the new slalom course.
|
|
April 18
Chris Paterson spools a painted tieback line.
|
|
April 18
The crew works at prepping the course components.
|
|
April 18
Rich Durham claims he was working at the time...
|
|
April 18
Johnny and Brian bring the barge around to install buoy arms on the course.
|
|
April 18
Don, Chris, and Johnny attach the tieback line to a buoy arm.
|
|
April 18
You're right Johnny. It IS big!
|
|
April 27
It's not just adults that are welcome at work parties. Junior members can contribute a lot. Clarissa Long scrapes paint from our railings.
|
|
April 27
Jessica Long on algae patrol, spraying decks and docks with bleach.
|
|
April 27
Melissa Long scraping paint.
|
|
April 27
Phaedra Harder burns old timbers and other junk.
|
|
April 27
Paul Wilson and Stacey Malysh constructing our new beds/storage lockers.
|
|
April 27
Stacey gives a big smile and a wave between all the heavy labour.
|
|
April 27
Ian Harder powerwashes the gangway.
|
|
April 27
Phaedra Harder does the final touches replacing the gangway tread.
|
|
April 27
Ric Corewyn takes a lunch break after installing tread on the gangway.
|
|
May 3
The jump driving course is painted and ready for installation.
|
|
May 3
Doug Petraschuck, Ric Corewyn, and Mike Mavius prepare to launch the jump driving course from the main float.
|
|
May 17
A crew work to replace our dock anchor lines during a low tide.
|
|
May 17
Our front lower deck was beginning to rot. Here a crew begins lowering the gangway from the dismantled deck to allow us to replace some beams.
|
|
May 17
Crews work on both the front deck and dock lines (in the background) while the tide is low.
|
|
May 17
After beam replacement the gangway is raised and reattached.
|
|
May 18
Ian Macdonald works on deck framing.
|
|
May 18
Matt and Joel Larsen lend a hand.
|
|
May 18
Ian Harder and Kevin Pickard spend the day repairing concrete footings.
|
|
May 18
Paul and Stacey continue their work on our beds / storage lockers.
|
|
May 18
Sandy Cohen cleans gutters.
|
|
May 18
Terry sands our handrails in preparation for painting.
|
|
|