2003 Photos - Spring Work Parties

Each spring we have a series of work parties to clean up our clubhouse, set up our ski courses and jump, and various other tasks required to get our site in shape for the season. This year we had a number of structural repairs as well.

Photos by Ian Harder.

Click on the thumbnail images to get a better view.

Preview Description Preview Description
Beam Replacement April 5

A group of members checks the front deck during replacement of the rotting main beams.
Beam Replacement April 5

More work on the deck beams.
Paul Kallio April 5

Paul Kallio takes a well-deserved break.
Slalom Course Prep April 13

The slalom course gets partially assembled and painted prior to installation.
Ric Corewyn April 13

Ric Corewyn does his best impression of a drowned rat.
Phaedra, Chris, and Louise April 13

Phaedra Harder, guest Chris Maslak, and Louise Harder rest after a day of cabin cleanup and repair.
Group Rest April 13

The work party group takes time at the end of the day to dry out and have a beer.
Rob Elliott April 18

Rob Elliott strings a tieback line to dry antifoul paint before attaching it to the new slalom course.
Chris Paterson April 18

Chris Paterson spools a painted tieback line.
Painting and Spooling April 18

The crew works at prepping the course components.
Rich Durham April 18

Rich Durham claims he was working at the time...
Barge April 18

Johnny and Brian bring the barge around to install buoy arms on the course.
Start Dock April 18

Don, Chris, and Johnny attach the tieback line to a buoy arm.
Big April 18

You're right Johnny. It IS big!
Clarissa Long April 27

It's not just adults that are welcome at work parties. Junior members can contribute a lot. Clarissa Long scrapes paint from our railings.
Jessica Long April 27

Jessica Long on algae patrol, spraying decks and docks with bleach.
Melissa Long April 27

Melissa Long scraping paint.
Phaedra Harder April 27

Phaedra Harder burns old timbers and other junk.
Paul and Stacey April 27

Paul Wilson and Stacey Malysh constructing our new beds/storage lockers.
Stacey Malysh April 27

Stacey gives a big smile and a wave between all the heavy labour.
Ian Harder April 27

Ian Harder powerwashes the gangway.
Phaedra Harder April 27

Phaedra Harder does the final touches replacing the gangway tread.
Ric Corewyn April 27

Ric Corewyn takes a lunch break after installing tread on the gangway.
Jump Course May 3

The jump driving course is painted and ready for installation.
Installing the Jump Course May 3

Doug Petraschuck, Ric Corewyn, and Mike Mavius prepare to launch the jump driving course from the main float.
Installing Dock Lines May 17

A crew work to replace our dock anchor lines during a low tide.
Lowering the Gangway May 17

Our front lower deck was beginning to rot. Here a crew begins lowering the gangway from the dismantled deck to allow us to replace some beams.
Deck and Dock Lines May 17

Crews work on both the front deck and dock lines (in the background) while the tide is low.
Raising the Gangway May 17

After beam replacement the gangway is raised and reattached.
Ian Macdonald May 18

Ian Macdonald works on deck framing.
Matt and Joel May 18

Matt and Joel Larsen lend a hand.
Concrete Work May 18

Ian Harder and Kevin Pickard spend the day repairing concrete footings.
Paul and Stacey May 18

Paul and Stacey continue their work on our beds / storage lockers.
Sandy Cohen May 18

Sandy Cohen cleans gutters.
Terry May 18

Terry sands our handrails in preparation for painting.